Pinto Swimming Pools Madrid, 1997

Construction

The basement is a reinforced concrete construction. As the water table level is 1.80 m below ground level, the base also has the task of balancing the buoyancy effect.

The roof is a multi-layer structure, with a ventilated chamber in order to evaporate any possible condensation. The glass sides comprise a curtain wall assembled by panels, with motorised friezes. The opaque walls are made from two sheets of exposed concrete.